मुख्य समाचार
पार्वा कार्यकारिणी के चुनाव - कार्यक्रम घोषित
______________________________________

Sunday, August 1, 2010

Gate No. 2 needs attention





On left are some picture of Gate No. 2. Don't you think it needs attention. PARWA ECs have always been partial to Group C. No doubt Gate No. 2 is near to Group C flats, but it is also near to some flats in Group B. PARWA EC should at least give some consideration to this Gate on it being near to some flats in Group B.

Time slots when this Gate opens are also not adequate if convenience of Group C residents is considered. Whenever I have raised this issue, some EC members have talked of shortage of security staff. This shortage is not a handicap when Gate No. 3 and 4 are opened for longer periods.

I do not know what two Block representatives of Group C residents are doing for solving problems of those residents whom they represent? They have not even called a meeting of Group C residents to know about the issues they should raise in EC related to welfare of Group C residents. One block representative has even been the President for two terms, but issues related to welfare of Group C residents have not engaged his attention. What may be the reasons for this?

I have put up a post on this blog detailing the issues related to welfare of Group C residents, but both block representatives do not seem be bothered about them. It is very unfortunate.

0 comments:

 

blogger templates | Make Money Online